The pour board
Flatwork and structure: what went down, when, and what protected it.
Zaras for Concrete & Masonry
Flatwork, block, and the protection period that turns a cold night into a procedure.
The pour side and the wall side of the same business do not end in the same month — crew months on the concrete side top out in August while masonry holds into October, then drops away faster through December. Cold does not close either lane; at forty degrees a written spec takes over and the job gains a protection record.
What carries season to season: the mix ticket the protection record the course log.
A driveway pour ahead of a hard freeze, a block wall going up, and an old wall priced for repair — three different jobs, one operating record.
Driveway pour, blankets on
Placed ahead of a hard night, the mix, the placement time, and what protected it all sitting on the job.
Tuckpointing scope
An old wall photographed by elevation before anyone prices it.
Concrete money comes from two engines — flatwork and structure on one calendar, block, brick and repair on another. Zaras runs both from the same record.
Flatwork and structure: what went down, when, and what protected it.
Block, brick and repair, on a calendar of its own.
The record, not the clipboard — every job from the estimate to paid, with nothing re-keyed into a second system.
Flatwork estimates by square foot and finish — access and finish recorded once, priced the same way every time.
Mix and placement records — what was placed, when, and at what temperature, attached to the job.
Cold-weather protection logs — blankets, heat, and cure conditions recorded against the pour, not remembered.
Control-joint timing — cut timing recorded where the callback will look for it.
Unit and mortar records — held above freezing and batched warm when the spec says so.
Course logs by wall — what went up each day, findable months later.
Repair scopes by elevation — tuckpointing and rebuild photographed before anyone prices them.
Invoicing, payments, QuickBooks sync — billing pulls straight from the record the pour or the wall scope opened, no separate system to reconcile.
Estimate → pour → protect → cure → paid — every concrete job, one record.
Plans and prices are public on the pricing page — no sales call to get a number.
Yes. Invoices and payments flow straight into QuickBooks — no double entry, no bookkeeper fights.
It’s yours, both directions. Customers, pour records, and open repair scopes come in with you when you join — and everything exports, any time.
Yes — commercial flatwork and site work with per-site records and NET-terms billing live on the same record as your residential book.
Concrete and masonry contractors running 1–40 crews — from an owner-operator to a multi-truck shop.
We onboard a limited number of shops at a time. Request an invite, fit is reviewed within 24 hours with a reply either way, and accepted shops get guided onboarding — pricebook and customer list loaded with you, not dumped on you.
Private beta
Every plan runs the full operating system for Concrete & Masonry — estimates, mix and placement records, protection logs, course logs, repair scopes, invoicing, payments. Pick the size that fits the crews you run today.
$49/ month
One mixer, one crew. Track the pour’s own protection log, hold the courses against the wall they belong to, price the repair off a photo instead of a memory — the record keeps the mix ticket and the course log straight.
from$149/ month
The pour board and the wall desk, run from one board. Every crew walking in with the wall’s own history.
Free trial first, month-to-month after — cancel anytime. Full plan detail on the pricing page.